Study of the Bike Route System
                            Date of addition: 11.08.2022                        
                                        
                The whole study is available here
                        Scroll to:
                    
                    Maps for GZM
            Location of points of photo-inventory in the field relative to the preliminary MSRT project        
        
    
            Preliminary MSTR project combined with the existing bicycle infrastructure and corridors after closed railway lines        
        
    
            MSTR final project with division into and numbering of routes relative to the bicycle route corridors of the Śląskie Voivodeship        
        
    
            MSTR final project – location of engineering structures and traffic engineering equipment